Q26003139 Alakai swamp trail boardwalk
- Solicitation Number
- Q26003139
- Status
- Released
- Department
- Land & Natural Resources
- Division
- Forestry and Wildlife
- Islands (where the work/delivery is to be performed)
- Kauai
- Category
- Services
- Release Date
- 05/28/2026
- Offer Due Date & Time
- 06/02/2026 02:00 PM
- Description
- Work will consist of two line items, the trail work and building the deck. Work responsibilities are specified within the line items
- Contact Person
- Sriharsha, Alexander
- alexander.p.sriharsha@hawaii.gov
- Phone
- 808-634-2270
- General Comments
- Boardwalk Work
- Procurement Officer
- Alexander Sriharsha
- Attachments
- AG-008 103D General Conditions (1.10.23).pdf
Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Sriharsha, Alexander.
Q26003139 Alakai swamp trail boardwalk
#
Title
Quantity
Unit of Measure
Commodity Code
| Commodity Code | Description |
|---|---|
| 237990 | Trail construction |
- Quantity
- 4
- Unit of Measure
- KILOMETER
- Title
- Alakai swamp trail boardwalk work
- Description
- Work on the Alaka’i Boardwalk trail. DOFAW will be responsible for placing material at the site for the contractor before work starts. Contractors will be responsible for moving boards and U channel posts into position for the layout of the boardwalk trail. Distances of positioning the material will vary depending on the location of helicopter drops. Weight of a 16 ft board with seven 4x4 runners attached, is approximately 150lb. One U channel post is approximately 13lb. Preparation of the alignment for the board layout can include leveling, shimming, cutting roots, or cutting low branches with consultation by DOFAW staff. There could be other site preparations needed that has not been mentioned.
U channel posts will be driven into the ground to secure the boards in place. The U channels driven need to be flush with the 4x4 runner as the end result. U channels will be connected to the 4x4 runner with lags. Various carpentry skills may be needed to appropriately make the work aesthetically pleasing (ie. Corner cuts, creating proper lengths, and building steps). Steps will need approval by DOFAW staff. All debris must be taken care of and cannot be left in the field (ie. Plastic shavings, cut pieces, metals). Start of the project will be at the end of the trail. Total length of the boardwalk is approximately 2 miles.
Contractor is responsible for their own transportation to the worksites. Contractor will be allowed to camp for their workdays at the worksite if they choose.
| Commodity Code | Description |
|---|---|
| 237990 | Trail construction |
- Quantity
- 1
- Unit of Measure
- SQUARE FOOT
- Title
- Alakai swamp trail boardwalk Deck
- Description
- DOFAW will be responsible for placing material at the site for the contractor before work starts. Work will be at the end of the trail (Kilohana vista) to build an 18ft X 11ft deck and a bench on the southwest portion of the deck which faces Wainiha valley. Contractor is responsible with coming up with material list and presenting it to DOFAW staff. DOFAW will provide some of the material. Various carpentry skills may be needed to appropriately make it secure and aesthetically pleasing. All debris must be taken care of and cannot be left in the field (ie. Plastic shavings, cut pieces, metals).
Contractor is responsible for their own transportation to the worksites. Contractor will be allowed to camp for their workdays at the worksite if they choose.
Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Sriharsha, Alexander.