B26000283 NH-0300(176) Freeway Management System Phase 4
- Solicitation Number
- B26000283
- Status
- Released
- Department
- Transportation
- Division
- Highways
- Islands (where the work/delivery is to be performed)
- Oahu
- Category
- Construction
- Release Date
- 08/12/2025
- Offer Due Date & Time
- 09/19/2025 02:00 PM
- Description
- The project includes the replacement of CCTV cameras along the H-3 Freeway and within the Tetsuo Harano Tunnel, installation and replacement of the corridor wide fiber optic trunk communications cable, installation of new CCTV cameras on H-3 Freeway and operator equipment upgrades at the Tetsuo Harano Tunnel traffic operations center. The project also includes the installation of new CCTV cameras on Pali Highway with limited conduit installation at camera sites and the installation of fiber optic cable and conduit between the Kalihi Interchange and Houghtailing Street along the H-1 Freeway.
- Contact Person
- Park, Rachael Hui Jin
- huijin.park@hawaii.gov
- Phone
- 808-587-2139
- General Comments
- [1] Response to all Questions and Requests for Information (RFIs) shall be issued ONLY by formal Addendum to this Solicitation and posted to HIePRO. [2] Bidders shall submit and upload their complete proposal document(s) to HIePRO prior to the posted Offer Due Date and Time. Proposals received after said due date and time shall not be considered. Any additional support documents explicitly designated as Confidential and/or Proprietary shall be uploaded in separate file(s) to HIePRO -- do NOT include any confidential or proprietary content in the proposal file. FAILURE TO UPLOAD THE REQUIRED PROPOSAL DOCUMENT(S) TO HIePRO SHALL BE GROUNDS FOR REJECTION OF THE BID.
- Procurement Officer
- Edwin Sniffen
- Attachments
-
FINAL SPECIFICATIONS w NTB NH 0300 176.pdf
FINAL PLANS NH 0300 176.pdf
Download All
Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Park, Rachael Hui Jin.
B26000283 NH-0300(176) Freeway Management System Phase 4
#
Title
Quantity
Unit of Measure
Commodity Code
Commodity Code | Description |
---|---|
237310 | Street construction |
238120 | Structural steel erecting or iron work contractors |
334290 | Traffic advisory and signalling systems manufacturing |
237310 | Bridge construction |
238110 | Concrete pouring |
238110 | Concrete pumping (i.e., placement) |
237990 | Horizontal drilling (e.g., underground cable, pipeline, sewer installation) |
238120 | Precast concrete panel, slab, or form installation |
238110 | Footing and foundation concrete contractors |
238210 | Cable splicing, electrical or fiber optic |
238210 | Fiber optic cable (except transmission lines) installation |
237310 | Highway construction |
- Quantity
- 1
- Unit of Measure
- JOB
- Title
- Refer to Specifications
- Description
- Refer to Specifications
Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Park, Rachael Hui Jin.