Public Display Solicitation

You must Log in with your eHawaii Account to respond to a solicitation.

Q25002302 NELHA FRP Pipeline

General Information
Solicitation Number
Q25002302version:    02
Status
Closed
Department
Business, Economic Development, & Tourism
Division
Natural Energy Laboratory of Hawaii Authority
Islands (where the work/delivery is to be performed)
Hawaii
Category
Goods
Release Date
04/07/2025
Amendment Date & Time
05/01/2025 02:00 PM
Amendment Reason
Added the option to allow for interested Vendor List.
Offer Due Date & Time
05/08/2025 02:00 PM
Description
The Natural Energy Laboratory of Hawaii Authority is procuring a FRP intake and discharge pipeline segments for a Goulds 200 hp 3409/L 14x18-23 pump at our 55" pump station. The procurement will include FRP riser piping, elbow and eccentric reducer on the suction side of the pump. In addition, we will need an eccentric reducer and spool piece on the discharge side of the pump. The suction side of the pump will require the pieces to perform close to full vacuum (29.92“ Hg). The discharge side will require the pieces to perform at a pressure of >50 psig (pump shutoff head). Attached plans from Makai Ocean engineering that outlines the current FRP piping we have installed at our pump station. We need to duplicate this configuration to install an additional 200 hp pump at our pump station.

FRP Riser Pipe (Suction Side): Qty.=1
Dia.: 30”
Length: 20.7 ft. (25 ft. minus 4.3021 ft)
Flange: One side, 30” stub end flange w/ hot dip galv. steel backup ring in the middle of a continuous run of FRP pipe

FRP Elbow with Eccentric Reducer (Suction Side): Qty.=1
Dia.: 30”
Bend Radius: 45deg
Length from riser pipe flange end to center of dia. of eccentric reducer: 51 5/8”
Port: ¾ F-NPT
Port: 2” F-NPT
Eccentric Reducer: 30” – 18” with flat face flange
Length from eccentric reducer flange (18”) to center of dia. of elbow at riser pipe: 81”

FRP Eccentric Reducer (Discharge Side): Qty.=1
Dia.: 24” – 14”
Length: 36 ½”
Flange: 14” flat face flange
Flange: 24” stub end flange
Port: 1” F-NPT

FRP Spool Piece (Discharge Side): Qty.=1
Dia.: 24”
Length: 25 1/8”
Flange: Stub end flange on both ends
Contact Person
Olson, Keith
Email
keith.olson@hawaii.gov
Phone
808-327-9523 x.251
General Comments
Procurement Officer
Jennifer Rasmussen
Attachments
NELHA FRP Pipeline Project.pdf
AG-008 103D General Conditions (1.10.23).pdf

Download All

Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Olson, Keith.

Q25002302 NELHA FRP Pipeline

Line Items
#
Title
Quantity
Unit of Measure
Commodity Code
 
Code Table
General
Quantity
1
Unit of Measure
EACH
Title
30"x25'-0" Riser Pipe (suction side): Qty. =1
Description
FRP Riser Pipe (Suction Side): Qty.=1
Dia.: 30”
Length: 20.7 ft. (25 ft. minus 4.3021 ft)
Flange: One side, 30” stub end flange w/ hot dip galv. steel backup ring in the middle of a continuous run of FRP pipe
Attachments Download All

Print
Code Table
General
Quantity
1
Unit of Measure
EACH
Title
FRP Elbow with Eccentric Reducer (Suction Side): Qty.=1
Description
FRP Elbow with Eccentric Reducer (Suction Side): Qty.=1
Dia.: 30”
Bend Radius: 45deg
Length from riser pipe flange end to center of dia. of eccentric reducer: 51 5/8”
Port: ¾ F-NPT
Port: 2” F-NPT
Eccentric Reducer: 30” – 18” with flat face flange
Length from eccentric reducer flange (18”) to center of dia. of elbow at riser pipe: 81”
Attachments

Print
Code Table
General
Quantity
1
Unit of Measure
EACH
Title
FRP Eccentric Reducer (Discharge Side): Qty.=1
Description
FRP Eccentric Reducer (Discharge Side): Qty.=1
Dia.: 24” – 14”
Length: 36 ½”
Flange: 14” flat face flange
Flange: 24” stub end flange
Port: 1” F-NPT
Attachments

Print
Code Table
General
Quantity
1
Unit of Measure
EACH
Title
FRP Spool Piece (Discharge Side): Qty.=1
Description
FRP Spool Piece (Discharge Side): Qty.=1
Dia.: 24”
Length: 25 1/8”
Flange: Stub end flange on both ends
Attachments

Print

Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Olson, Keith.

Q25002302 NELHA FRP Pipeline

Instructions
  • VENDOR REGISTRATION IN HAWAII COMPLIANCE EXPRESS (HCE) : Vendors can register at https://vendors.ehawaii.gov/hce via an annual subscription fee and should subscribe prior to responding to a solicitation. For more information visit the HCE Section of the FAQs at http://spo.hawaii.gov/faqs/#tabs-4.
  • COMPLIANCE AND DOCUMENTATION: Vendors are required to be compliant with all appropriate state and federal statutes. Proof of compliance is required through HCE or via paper documentation.
  • QUESTIONS ABOUT THIS SOLICITATION: Unless otherwise indicated, questions regarding this solicitation must be directed to the Buyer listed.
  • RESPONSE TO THIS SOLICITATION: Only responses submitted through HIePRO shall be considered for award.
  • OFFER DEEMED FIRM/AUTHORITY TO SUBMIT OFFER: Submission of an electronic response to the State of Hawaii constitutes and shall be deemed an offer to sell the specified goods and/or services to the State of Hawaii at the price shown in the response and under the State's Terms and Conditions. The electronic response submitter certifies that he/she is authorized to sign the response for the submitting vendor and that the response is made without connection with any person, firm, or corporation making a response for the same goods and/or services and is in all respects fair and without collusion or fraud.
  • HAWAII GENERAL EXCISE TAX (GET): Unless otherwise stated in this solicitation, vendors shall include all applicable taxes in the price submitted. The Hawaii General Excise Tax (GET) shall not exceed 4.712% for the islands of Oahu, Kauai , Hawaii, and Maui.
  • VENDOR COMPLIANCE – PAPER DOCUMENTS : Vendors not utilizing HCE shall provide paper certificates that must be valid at the time of award. All applications for applicable clearances are the responsibility of the vendor, who must be compliant pursuant to HRS§103D-310(c) with the chapters 1) Chapter 237, General Excise Tax Laws; 2) Chapter 382, Hawaii Employment Security Law; 3)Chapter 386, Worker’s Compensation Law; 4) Chapter 392, Temporary Disability Insurance; 5)Chapter 393, Prepaid Health Care Act; and 6) §103D-310(c), Certificate of Good Standing (COGS) for entities doing business in the State. Upon receipt of compliance paper documents (A-6, LIR#27, COGS), the purchasing agency reserves the right to verify their validity with the respective issuing agency.
  • TRANSACTION FEES: The awarded vendor shall pay a transaction fee of 0.75% (.0075) of the award, not to exceed $5,000 for each award. This transaction fee shall be based on the original award amount and the awarded vendor shall be responsible for payment of the fee to Tyler Hawaii, the vendor administering the HIePRO. Payment must be made to Tyler Hawaii within thirty (30) days of receipt of invoice. The invoice is generated based on the date the award is posted.
  • VENDOR NON-COMPLIANCE : NON-COMPLIANCE may result in a vendor not receiving an award, delay of payment, or cancellation of award. If the vendor does not maintain timely compliance, which is the vendor’s responsibility, an offer otherwise deemed responsive and responsible may not be awarded. State agencies may check for compliance at any time.
  • ADDITIONAL FEES AND CHARGES: Vendors shall include all applicable fees, charges, surcharges, shipping/handling, delivery, or any other charges associated with this solicitation in the price submitted.