Public Display Solicitation
You must Log in with your eHawaii Account to respond to a solicitation.
Q25001705 Kawainui Levee Vegetation Maintenance, Kailua, Oahu
- Solicitation Number
- Q25001705
- Status
- Closed
- Department
- Land & Natural Resources
- Division
- Forestry and Wildlife
- Islands (where the work/delivery is to be performed)
- Oahu
- Category
- Services
- Release Date
- 02/12/2025
- Offer Due Date & Time
- 02/26/2025 02:00 PM
- Description
- Vegetation control on the Kawainui Marsh Flood Control Levee.
Services are requested for mechanical vegetation control on earthen berm of the Flood Control Levee. The levee is approximately 8,000 feet long. Control may be done with light mowers, lawn mowers, weed trimmers. Heavy machinery – i.e. machines over 1,000 lbs. are not allowed. Multiple line items are included in the bid package; each line item represents a section of the Levee.
The final award may include sections to be completed multiple times, based on the total costs.
Bidder must be HCE compliant.
The price must include all costs associated with the vegetation control, based on the provided specs.
Access will be provided to awarded bidder by the Oahu Division of Forestry and Wildlife - Contact Person
- Misaki, Jason
- jason.c.misaki@hawaii.gov
- Phone
- 808-295-5896
- General Comments
- Procurement Officer
- David G. Smith
- Attachments
-
Kawainui Levee Maintenance.docx
103D-1 General Conditions.pdf
Download All
Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Misaki, Jason.
Q25001705 Kawainui Levee Vegetation Maintenance, Kailua, Oahu
#
Title
Quantity
Unit of Measure
Commodity Code
Commodity Code | Description |
---|---|
561730 | Lawn mowing services |
- Quantity
- 1
- Unit of Measure
- JOB
- Title
- Section 1 - Levee Vegetation Maintenance ~3.8 Acres
- Description
- • Vegetation control area is from the start of earthen levee slope off the pedestrian foot path, to two (2) feet from the toe of the levee on both sides.
• Target vegetation is all grasses, weeds, and shrubs with a trunk diameter of less than 2 inches.
• All vegetation shall be mowed or cut to a minimum height of 3 inches.
• All cut woody vegetation must be removed and disposed of off-site.
• Each “Job” is considered “complete” when vegetation profile is uniform throughout the entire section based on the listed specifications.
• Vendors are responsible for establishing safe distances for pedestrians, based on the type of equipment used for vegetation control.
• Machinery, tools and equipment shall not be left on the flood control levee unattended. Vendors are responsible for the de-mobilization of equipment if there are no personnel on site.
• Earthen berm soil, concrete walkway, and floodwall shall not be altered when conducting vegetation control.
• For multiple job awards, the Division will determine the time interval when repeating vegetation control per section.
Commodity Code | Description |
---|---|
561730 | Plant maintenance services |
- Quantity
- 1
- Unit of Measure
- JOB
- Title
- Section 2 - Levee Vegetation Maintenance ~4.4 acres
- Description
- • Vegetation control area is from the start of earthen levee slope off the pedestrian foot path, to two (2) feet from the toe of the levee on both sides.
• Target vegetation is all grasses, weeds, and shrubs with a trunk diameter of less than 2 inches.
• All vegetation shall be mowed or cut to a minimum height of 3 inches.
• All cut woody vegetation must be removed and disposed of off-site.
• Each “Job” is considered “complete” when vegetation profile is uniform throughout the entire section based on the listed specifications.
• Vendors are responsible for establishing safe distances for pedestrians, based on the type of equipment used for vegetation control.
• Machinery, tools and equipment shall not be left on the flood control levee unattended. Vendors are responsible for the de-mobilization of equipment if there are no personnel on site.
• Earthen berm soil, concrete walkway, and floodwall shall not be altered when conducting vegetation control.
• For multiple job awards, the Division will determine the time interval when repeating vegetation control per section.
Commodity Code | Description |
---|---|
561730 | Plant maintenance services |
- Quantity
- 1
- Unit of Measure
- JOB
- Title
- Section 3 - Levee Vegetation Maintenance ~8.3 acres
- Description
- • Vegetation control area is from the start of earthen levee slope off the pedestrian foot path, to two (2) feet from the toe of the levee on both sides.
• Target vegetation is all grasses, weeds, and shrubs with a trunk diameter of less than 2 inches.
• All vegetation shall be mowed or cut to a minimum height of 3 inches.
• All cut woody vegetation must be removed and disposed of off-site.
• Each “Job” is considered “complete” when vegetation profile is uniform throughout the entire section based on the listed specifications.
• Vendors are responsible for establishing safe distances for pedestrians, based on the type of equipment used for vegetation control.
• Machinery, tools and equipment shall not be left on the flood control levee unattended. Vendors are responsible for the de-mobilization of equipment if there are no personnel on site.
• Earthen berm soil, concrete walkway, and floodwall shall not be altered when conducting vegetation control.
• For multiple job awards, the Division will determine the time interval when repeating vegetation control per section.
Commodity Code | Description |
---|---|
561730 | Plant maintenance services |
- Quantity
- 1
- Unit of Measure
- JOB
- Title
- Section 4 - Levee Vegetation Maintenance ~5.4 acres
- Description
- • Vegetation control area is from the start of earthen levee slope off the pedestrian foot path, to two (2) feet from the toe of the levee on both sides.
• Target vegetation is all grasses, weeds, and shrubs with a trunk diameter of less than 2 inches.
• All vegetation shall be mowed or cut to a minimum height of 3 inches.
• All cut woody vegetation must be removed and disposed of off-site.
• Each “Job” is considered “complete” when vegetation profile is uniform throughout the entire section based on the listed specifications.
• Vendors are responsible for establishing safe distances for pedestrians, based on the type of equipment used for vegetation control.
• Machinery, tools and equipment shall not be left on the flood control levee unattended. Vendors are responsible for the de-mobilization of equipment if there are no personnel on site.
• Earthen berm soil, concrete walkway, and floodwall shall not be altered when conducting vegetation control.
• For multiple job awards, the Division will determine the time interval when repeating vegetation control per section.
Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Misaki, Jason.