Public Display Award

General Information
Award Title
H-3 Replacement of Expansion Joint 2 O.B. Sta. 274+49.91 ±
Award Description
H-3 Replacement of Expansion Joint 2 O.B. Sta. 274+49.91 ±
Date of Notice of Award
04/13/2026
Solicitation Number
Q26001789
Contract Number
Basis of Award
Price Analysis
Contract Start Date
04/13/2026
End Date / Delivery Date
08/27/2026
Awardee
HAWAII WORKS, INC.
Method of Procurement
Small Purchase (RFQ)
Department
Transportation
Original Award Amount
$220,000.00
Current Award Amount
$220,000.00
General Comments
Contact Person
JoAnn Nakata
Email
joann.m.nakata@hawaii.gov
Phone
808-255-3427
Line Items
Line Item Number
Line Item Title
Line Item Comments
Attachments
Code Table
Award By
Unit Price and Quantity
Quantity
1
Unit of Measure
JOB
Unit of Measure
JOB
Price per Unit
$186,000.00
Total Price
$186,000.00
Title
H-3 Replacement of Windward Viaduct Expansion Joint 2 O.B.
Description
Bid Instructions:
Contractor shall read bidding instructions prior to bid. Failure to follow these instructions may result in rejection of the bid. State reserves the right to remove Line Item No. 2 to reduce the total bid cost. If Line Item No. 2 is removed, the State will provide the development of traffic control plans (TCPs) and implementation of traffic control.

1. Use Line Item No. 1 to bid for all repair work costs, excluding the costs for development of traffic control plans and implementation of traffic control. Associated costs shall include, but are not limited to, repair materials, equipment, tools, permits, BMPs, all applicable taxes, and incidental work.

2. Use Line Item No. 2 to bid solely for the development of traffic control plans and implementation of traffic control. Associated costs shall include, but are not limited to the TCP design services, labor, equipment, materials, signage, all applicable taxes and incidental work.
Solicitation Attachment

Print
Code Table
Award By
Unit Price and Quantity
Quantity
1
Unit of Measure
JOB
Unit of Measure
JOB
Price per Unit
$34,000.00
Total Price
$34,000.00
Title
Development and Implementation of Traffic Control
Description
Bid Instructions:
Contractor shall read bidding instructions prior to bid. Failure to follow these instructions may result in rejection of the bid. State reserves the right to remove Line Item No. 2 to reduce the total bid cost. If Line Item No. 2 is removed, the State will provide the development of traffic control plans (TCPs) and implementation of traffic control.

1. Use Line Item No. 1 to bid for all repair work costs, excluding the costs for development of traffic control plans and implementation of traffic control. Associated costs shall include, but are not limited to, repair materials, equipment, tools, permits, BMPs, all applicable taxes, and incidental work.

2. Use Line Item No. 2 to bid solely for the development of traffic control plans and implementation of traffic control. Associated costs shall include, but are not limited to the TCP design services, labor, equipment, materials, signage, all applicable taxes and incidental work.
Solicitation Attachment

Print
Amendments
Instructions
  • TRANSACTION FEES: The awarded vendor shall pay a transaction fee of 0.75% (.0075) of the award, not to exceed $5,000 for each award. This transaction fee shall be based on the original award amount and the awarded vendor shall be responsible for payment of the fee to Tyler Hawaii, the vendor administering the HIePRO. Payment must be made to Tyler Hawaii within thirty (30) days of receipt of invoice. The invoice is generated based on the date the award is posted.
  • HAWAII GENERAL EXCISE TAX (GET): Unless otherwise stated in this solicitation, vendors shall include all applicable taxes in the price submitted. The Hawaii General Excise Tax (GET) shall not exceed 4.712% for the islands of Hawaii, Kauai, Oahu and Maui.
  • ADDITIONAL FEES AND CHARGES: Vendors shall include all applicable fees, charges, surcharges, shipping/handling, delivery, or any other charges associated with this solicitation in the price submitted.